7799国产精品久久久久,另类综合欧美亚洲激情,天天操夜夜操高清超清,av在线播放国产不卡

Online Service
Scan it
Support hotline
18681482740
Service Hotline:
18681482740
中文  |   English
Industry knowledge
Contact

Address: Floor 1, Building 2, Quanshengchang Industrial Park, Buyong Shajing Road, Shajing Street, Shenzhen

Contact: Mr. Li 18681482740

Email: lilinhan1314@126.com

Website: www.dy326.cn

Industry knowledge
Assembly of upper mold seat for precision stamping molds
07-19 / 2024

In order to shorten the processing cycle of stamping molds, enhance mold accuracy, unify the methods of operators, reduce anomalies that may occur during mold production, ensure production quality and mold life, the following explanation is given to the assembly process of the upper mold seat of the stamping mold.




The assembly of the upper die seat of the stamping mold is completed in the following 10 steps:




1. Splint Φ 12.000 positioning holes and auxiliary guide pillar holes, with a circumferential chamfer of R1.0 and polished




2. Use a 600 # oilstone or diamond file to remove burrs from the frame opening.




3. Use 600 #~1000 # oilstones to flatten both sides of the template and remove any burrs.




4. Use kerosene and alcohol to clean the mold surface and inner holes.




5. Install the auxiliary guide set into the same template.




6. Place the clamping part of the punch into the template frame and check if the punch is smoothly removed and placed. (Do not put the punch in after it is closed to avoid accidentally breaking the small punch)




7. Fix the punch with a pressure plate. (Note that the pressure plate should not be too close to the punch to avoid interference with the punch.) After fixing the punch, there should be a small amount of movement space to facilitate the natural alignment of the punch.




8. Gently close the detachment plate and the detachment back plate together into the clamp plate, and check if there is any interference in the positioning of the detachment back plate's pressing plate. When fully closed, there should be no gap between the detachment back plate and the clamp plate.




9. After joining, the cutting punch should exceed the pressing surface by more than 0.8mm (minus material thickness).




10. Insert the adjustment rod and upper mold adjustment punch, and rotate the screw until the adjustment punch approaches the effective height.






Through the above 10 steps, the assembly of the upper mold seat of the stamping mold has been completed.






Licao Precision is an ODM/OEM professional manufacturer specializing in the design and manufacturing of precision stamping molds and precision hardware stamping.


Links:Zibo CNC machine tool automatic car washing machine Qingdao refrigeration equipment grinder equipment steel grit fire inspection cabinet sweeper motor desulfurization denitrification equipment drawing mold washing machine automatic soldering machine server repair HART475 hand operator dust-free cloth dust-free paper stack screw type Sludge dehydration machine, precision repair welding machine, Shandong motor repair, rotary hot pot equipment, integrated ultrasonic cleaning machine, Zhongjie radial drilling machine, beer equipment, Shenzhen brass manufacturer, welcome lamp, lens digging, drilling rig, aluminum housing manufacturer, automatic dispensing machine, automatic screwing machine neodymium Iron boron magnet 4g router wireless bridge
We provide you with high quality products
一区二区三区中文字幕免费在线| 精品人妻一区二区三区日产乱码| 影音先锋亚洲中文综合网| 男人透女人视频短篇| 欧美日韩亚洲人人夜夜澡| 普通话大屌操小穴| 8050午夜三级的全黄| 色噜噜AV亚洲色一区二区| 久久久国产系列丝袜熟女| 干女人逼逼的大几把| 黑人大鸡巴日小逼| 大屁股真人日逼视频| 国产精品亚洲一区二区三区下载| 无码爆一二三区免费视频| 国产欧美洲中文字幕床上| 日本精品久久人妻一区二区三区| 男人扒开女人腿狂躁免费| 日本亚洲欧洲一区二区| 白嫩在线亚洲观看| 777米奇在线视频无码| 黑人巨茎和中国美女视频| 日本入室强伦姧人妻中文| 久久久三级黄片免费视频| 深插巴西美女的逼| 美国大骚逼啊啊啊| 亚洲Av无码专区一区二区三区| 娇嫩的被两根粗大的np| 精品免费福利片国产| 欧美巨屌虐无毛骚逼| 性爱大鸡吧喷水视频| 亚洲欧美日韩精品一区二区| 国产精品视频美熟女一区二区| 操鸡巴奶子在线观看| 日本成人精品一区二区三区| 精品日韩欧美精品日韩| 草草久性色av综合av| 中文字幕在线观一二三区| 三级成人国产高清视频| 中文字幕精品字幕一区二区三区| 亚洲午夜福利视频在线| 日日狠狠久久888av|